Pete 3.23.2025

Get Connected Icon Happens On Mar 23, 2025
Expired

Description

I continued working from the Cave Branch Trailhead heading north. Work included cutting and removing five small blowdowns and cleaning six drains across the trail. I stopped at 0.38 mile north of the bridge where there is an 18-inch diameter blowdown as seen in the attached photos. I cleared debris from around the blowdown so that hikers can get under the large tree as there is now a four-foot clearance.